Discharge route first
Clean runoff goes to storm. Wash water needs an interceptor. Process effluent may need pretreatment and a discharge agreement under the municipal sewer use by-law. Nothing is designed until this is established.
Licensed since 1991, working on sites that cannot stop. We establish the discharge route and the load class before we price anything, and we phase the work so you keep operating.
A residential trench drain has one job: move surface water to a legal outlet. A commercial drain has to do that while surviving the traffic that crosses it, satisfying whatever governs the water it carries, and going in without shutting the business down.
Those three constraints — load, discharge, and continuity — decide almost everything about the specification and the price. We settle them at the site visit, before quoting, which is why we do not price commercial work over the phone.
Clean runoff goes to storm. Wash water needs an interceptor. Process effluent may need pretreatment and a discharge agreement under the municipal sewer use by-law. Nothing is designed until this is established.
Not from the building type. Forklifts punish a drain harder than trucks do, and a grate rated for the wrong thing fails within a season. Delivery lanes, dock aprons and production aisles each get specified for what really crosses them.
Bay by bay at a dealership, zone by zone in a plant, off-hours next to patient care. Phasing is planned with your team before the first cut, and the cure window is built into the schedule rather than discovered.
You see what is drainage, what is compliance, and what is access. After-hours premiums and interceptor work are named lines, not margin folded into a lump sum.
Every commercial property type we install trench drains for. Each page covers the load class, the discharge route, and how the install is phased around your operation.
Heavy-duty surface drainage engineered for commercial traffic, runoff volume, and year-round reliability.
See detailsSurface drainage designed for service bays, drive-through lanes, and vehicle handling areas.
See detailsDrainage designed for kitchens, prep areas, wash zones, and service corridors.
See detailsSurface drainage designed for fueling lanes, forecourts, and high-exposure pavement areas.
See detailsHigh-capacity drainage engineered for large floor areas, equipment traffic, and industrial wash-down conditions.
See detailsFour drainage zones on one site: service bays, wash and detail bays, delivery lanes, and the customer entrance.
See detailsProcess-floor drainage specified around effluent chemistry, forklift loading, and sewer discharge compliance.
See detailsStainless channel built for grit, detergent and chloride, with sediment capture ahead of the interceptor.
See detailsHygienic stainless channel with radiused corners and built-in fall, designed to be sanitised rather than merely rinsed.
See detailsAmbulance bays, loading docks, kitchens and processing areas - phased around infection control and continuity.
See detailsCommercial work is quoted after a site visit, and for a reason we explain in full on the commercial cost guide: load class, discharge requirements, and after-hours phasing move the number far more than the channel does.
Read the commercial cost guide · Load classes A15 to F900 · Channel materials compared
Master Plumber licensed, operating across the GTA as the trench drain practice of MT Drains & Plumbing Ltd. since 1991. We work directly with facilities teams and to mechanical consultants’ specifications through general contractors.
Both. On construction and renovation projects we work through the general contractor and to the mechanical consultant’s specification, providing shop drawings for review. For direct facility work we deal with your maintenance or operations lead. Either way the discharge route and phasing get confirmed in writing before we start.
In almost every case, yes — that is the normal way we run commercial work. Dealerships come out bay by bay, plants zone by zone, healthcare areas on an agreed continuity plan and usually off-hours. Some scopes, like a car wash conveyor tunnel, genuinely need a planned shutdown, and we tell you that up front rather than discovering it.
Usually within the same week across the GTA, in a fixed time slot. We do not quote commercial work without seeing it, because the discharge route and the real traffic loading cannot be established from a description.
Yes. Where a job needs a municipal storm connection permit, an interceptor, or coordination on a sewer discharge position, we handle the application and inspection coordination. On healthcare sites we work to your infection control process. We identify what applies at the site visit so the timeline is honest from the start.
We will tell you, and we will not tie new work into a non-compliant discharge. Process or wash water reaching the storm system is the most common version of this. It changes the right scope of work, and finding out during a quote is a great deal better than finding out from an inspector.
Yes, and we hand over the maintenance routine at completion. Commercial installations need clearing far more often than residential ones — quarterly on high-traffic and washdown sites, and interceptors on their own service interval. A drain that is not maintained silts up and stops working long before it wears out.
We establish the discharge route and the real traffic loading on site, then issue a fixed, itemised quote.
Free site visit across the GTA. We'll tell you what you actually need — no upsell.